A downloadable game for Windows

What if dice poker met neon lights and jazz? Welcome to Poker Lines.

Poker Lines is a calm and cozy game inspired by the intersection of Dice Poker and classic Lines.

Place, move, and arrange neon dice on the board to form poker combinations in a line. The game never rushes you: take your time, plan your moves, and enjoy the pleasant melodies and jazz charm in a stylish neon atmosphere.

Key Features:

  • Classic Poker Hands: Form lines horizontally or vertically — from a simple Pair to a Full House and an epic Five of a Kind.
  • Strategic Depth ("Strict" Rules): The game rewards planning. Only combinations involving the last moved die can be scored. You have full control: confirm the combination (Left Click) or skip it (Right Click) to build an even bigger hand for your next turn.
  • Reward System: The more complex the combination you create, the fewer new dice will spawn on the board during the next turn.
  • Lifesaver Jokers: Collect a required number of combinations to earn a powerful bonus — the Joker. Use it when the board is almost full to instantly clear a large portion of it. You can hold up to 3 Jokers at a time.
  • Balanced Infinity: The game scales in difficulty over time, ensuring endless and comfortable gameplay.
  • Built-in Tutorial (How to Play): An interactive, step-by-step tutorial will quickly and visually teach you all the game mechanics right on the board.

Note: The Demo version allows for endless play but limits the total number of lifesaver Jokers you can earn to 5 per session. The full game features unlimited Joker progression!

Updated 1 day ago
Published 4 days ago
StatusIn development
PlatformsWindows
AuthoreXtendedZero
GenrePuzzle
Made withGodot
Tags2D, Dice, Godot, lines, poker, Singleplayer
Average sessionAbout a half-hour
LanguagesEnglish
InputsMouse
AccessibilityColor-blind friendly, Interactive tutorial, Textless
AI DisclosureAI Assisted, Sounds

Download

Download
PokerLines_Demo_Win64.zip 95 MB

Development log

Leave a comment

Log in with itch.io to leave a comment.